In the process of digging out about a foot of soil and framing up to pour concrete next week. When that is set up will dig out about 4" of soil to pour a approach in front of the building. The approach will be the same height as the entrance to the building. Will probably run conduit underground as well.
Delevery is about 9 weeks out. Will give the concrete time to cure. Have enough left over insulation to do the small building.