Day 2 with my new Yager, or should I call it an Ager since that is what it looks like on the bike. It took me about 25 minutes to do my first pre-ride check this AM. I also had to tighten my L mirror. A 15 mm open end wrench did it. Just lift the boot and there is the nut. Nothing to it. I put about 20 miles on it yesterday and since I am also a new rider, there’s much to learn. I got in a lot of press & roll practice so that's a good thing. Now to find a place to practice fast stops. If I ever get the ignition switch down that will be a good start. Checking the coolant level was a snap, Good thinking by whoever came up with it. I will not make this a diary so you won't have to put up with me every day.
Stay safe and let's hit the bricks.
Rich